A fast-growing US SaaS provider wanted an India engineering hub without the overhead of setting up an entity, office and hiring engine on its own.
Compliance-heavy domain (HIPAA-aligned controls), an aggressive product roadmap, and a mandate that the centre feel like one team with the US organisation from day one.
“We got a centre that already worked the way we work — and then we got to own it.”
— Client sponsor (name withheld under NDA)
| Industry | Healthcare & Life Sciences |
| Services | Global Capability Centers · Build-Operate-Transfer |
| Technology | AWS · Kubernetes · GitHub Actions · Snowflake |
| Duration | Build 4 months · Operate 18 months |
| Team | 35 engineers at transfer |
A 30-minute architecture call with the engineers who ran this work.
Book a 30-minute callDetails are anonymised and figures rounded to protect client confidentiality.
A regional logistics operator running 60+ workloads on ageing on-premise VMware needed to exit two data centres without disrupting 24×7 operations.
A multi-plant textile manufacturer had production data locked in PLC historians, an ERP and spreadsheets, with no single view of equipment effectiveness.
Buyers spent hours locating supplier contracts, price lists and compliance documents spread across SharePoint, email and an ERP before answering a single customer request.
Global IT services and cloud-native engineering, with a precision thin-section bearings manufacturing division. Headquartered in Ahmedabad, India.
307 Anand Chambers, Near High Court Crossing, Navrangpura, Ahmedabad, Gujarat 380009, India
info@kunalbearings.com
GSTIN 24ABBPJ5916C1Z6 · IEC 0802004962
REX INREX0802004962EC004 · LUT AD2407210055976